Industrial Solutions

New Plant Setup & Project Development

Project-development coordination for greenfield and brownfield plants: the right technology, the right EPC and engineering partners, and a procurement path that holds together from feasibility to start-up.

How we help

What this pathway covers

We help owners and developers take a new plant from requirement definition through technology, engineering-partner and contractor selection to a procurement path that holds together up to start-up.

Building a process plant is a sequence of partner decisions — consultant, licensor, engineering firm, EPC or EPCM contractor, equipment vendors, inspectors, freight forwarders — each of which constrains the next. Owners who make those decisions in isolation usually pay for it in interfaces: scope gaps between contracts, duplicated engineering and schedule slips that nobody owns.

MINCAT works as the owner's coordination partner across that sequence. We frame the requirement, coordinate feasibility inputs, run technology and contractor identification, support procurement and keep the parties aligned through execution and start-up. Engineering, construction and commissioning are performed by the qualified partners contracted for them; MINCAT's role is to make sure they were the right partners, that their scopes fit together, and that the project keeps moving.

Portfolio

Scope we coordinate

Scope is defined per engagement. Where a technology or product is proprietary, it is licensed or supplied by its owner; MINCAT identifies, evaluates and coordinates.

  • Greenfield projects
  • Brownfield expansion
  • Feasibility and concept coordination
  • Technology and licensor identification
  • Technology comparison
  • EPC / EPCM partner identification
  • FEED and basic-engineering partner coordination
  • Equipment strategy and sourcing
  • Vendor development
  • Procurement strategy
  • Project coordination
  • Inspection and QA/QC coordination
  • Logistics coordination
  • Commissioning and start-up support through qualified partners

Typical requirements

Situations in which clients engage us

If your requirement is not on this list, describe it anyway. The list is illustrative, not a menu.

  • A new fertilizer, chemical or hydrogen production facility at concept stage
  • Brownfield capacity expansion alongside a running plant
  • Selection of an EPC or EPCM contractor with relevant reference plants
  • An owner's-side team that lacks bandwidth for vendor development and expediting
  • Debottlenecking or revamp projects needing a technology-to-execution path
  • Project developers assembling a technology, engineering and supply package for financing

Technical considerations

What usually decides the outcome

  • Contracting strategy before contractor

    Lump-sum EPC, EPCM, split packages or owner-managed procurement each shift risk differently. The strategy is chosen against your team's capacity and the project's financing, not the other way round.

  • Interfaces are where projects leak

    Battery limits between licensor, engineering and EPC scopes must be defined in writing early; MINCAT tracks these interfaces as a live register.

  • Long-lead equipment drives the schedule

    Reactors, compressors, large exchangers and columns must be identified and released early, often before the EPC is on board.

  • Reference plants matter more than brochures

    Contractor qualification is based on comparable projects delivered, key personnel actually available, and financial capacity to carry the contract.

Scope and responsibility

What MINCAT does — and what qualified partners deliver

MINCAT is asset-light. The distinction between our coordination role and partner-delivered scope is stated in every proposal and contract.

MINCAT scope

Coordination, evaluation and support

  • Requirement definition and project-development roadmap
  • Coordination of feasibility, technology and licensor evaluation
  • EPC/EPCM and engineering partner identification and qualification
  • Equipment strategy, vendor development and procurement support
  • Interface register, schedule tracking and stakeholder coordination within agreed scope
Partner-delivered scope

Contracted directly with the qualified partner

  • Feasibility studies and FEED — engineering consultancies
  • Detailed engineering, construction and installation — EPC/EPCM contractor
  • Inspection, expediting and logistics — accredited third parties
  • Commissioning and performance runs — licensor and contractor teams

Commercial and procurement considerations

How engagements are structured

  • Owner's-side coordination is scoped by phase, with deliverables and decision points defined for each phase.
  • Contractor and vendor contracts are always between you and the partner; MINCAT does not take a margin on partner scope.
  • Early engagement reduces cost: the largest savings are made in technology, contracting strategy and long-lead decisions.

Frequently asked

Questions we hear about new plant setup

Does MINCAT act as the EPC contractor?
No. Engineering, procurement-on-contract, construction and commissioning are delivered by the qualified EPC/EPCM and engineering partners identified for the project, under their own contracts with you. MINCAT coordinates on the owner's side within an agreed scope.
At what stage should we involve MINCAT?
The earlier, the more value: technology, contracting strategy and long-lead equipment decisions are made before an EPC is appointed. That said, we regularly join projects mid-way to recover a stalled procurement or contractor selection.
Can you support project financing discussions?
We provide the technology comparison, contractor qualification and procurement documentation that lenders' technical advisers ask for, and coordinate responses to their questions. Financial advisory itself is outside our scope.